Big Fixes

The repair bills coming due.

  • 16 Tracked terms
  • Last 30 days Feed window

What this topic collects on

An article joins this feed when it matches these terms. Each one is also a search of its own.

Latest in Big Fixes

srqmagazine.com
srqmagazine.com > srq-daily > 2026-09-14 > 30330_Preliminary-Review-Finds-Blackburn-Point-Swing-Bridge-Can-Be-Rehabilitated-at-Substantially-Lower-Cost

Preliminary Review Finds Blackburn Point Swing Bridge Can Be Rehabilitated at Substantially Lower Cost

4+ hour, 57+ min ago   (59+ words) SRQ DAILY MONDAY BUSINESS EDITION MONDAY SEP 14, 2026 | « View The Monday Sep 14, 2026 SRQ Daily Edition « Back To SRQ Daily Archive Mallory Evans | Sep 14, 2026 Suffolk Promotes Brian Stathers to Oversee Sarasota Construction PGT's WinGuard Vinyl line named winner in inaugural The Construction…...

Saanich News
saanichnews.com > 09/13/2026 > letter-active-transportation-plan-lacks-transparency

LETTER: Active transportation plan lacks transparency

8+ hour, 44+ min ago   (210+ words) Published 5:00 pm Sunday, September 13, 2026 The agenda for the Feb. 10, 2025 Saanich Council Committee of the Whole Meeting had an item concerning New Transportation Capital Funding. “To present options to accelerate the Active Transportation Plan, transportation infrastructure capital funding shortfalls, and to…...

Chicago Tribune
chicagotribune.com > 09/13/2026 > rda-10-million-seed-money-projects

RDA spreading news about $10 million seed money for projects

2+ day, 10+ hour ago   (363+ words) AJ Bytnar is making the rounds to tell communities along the South Shore Line about money available for transit-oriented development. Bytnar, economic development director at the Northwest Indiana Regional Development Authority, wants communities with transit development districts surrounding train stations…...

WHYY
whyy.org > articles > data-center-protest-philadelphia

Protest planned Monday at Philadelphia City Hall for data center moratorium

13+ hour, 14+ min ago   (559+ words) A Way with Words is an upbeat and lively show about language examined through culture, history, and family. Language debates, variations, and evolution, as well as new words, old sayings, slang, family expressions, word histories, etymology, linguistics, regional dialects, word…...

WHP
local21news.com > news > local > puc-to-examine-data-center-impact-on-electric-reliability-consumer-costs

PUC to examine data center impact on electric reliability, consumer costs

10+ hour, 4+ min ago   (193+ words) HARRISBURG, DAUPHIN CO. (WOLF) — Pennsylvania utility regulators will examine how the rapid growth of data centers could affect electric-grid reliability and whether other customers could be left paying costs tied to the facilities’ enormous energy demand. The Pennsylvania Public Utility…...

PennWatch
pennwatch.org > puc-addresses-data-center-impacts-on-electric-reliability-and-consumer-costs

PUC Addresses Data Center Impacts on Electric Reliability and Consumer Costs

19+ hour, 54+ min ago   (344+ words) As rapid data center development adds significant new demand to the regional electric grid, the Pennsylvania Public Utility Commission took steps to examine Pennsylvania’s emergency load control procedures and the allocation of costs associated with large computational loads. By a…...

Yahoo Finance
finance.yahoo.com > technology > articles > google-outlines-17b-project-tembo-171700686.html

Google outlines $17B Project Tembo data center campus planned for Laramie County

1+ day, 22+ hour ago   (1096+ words) CHEYENNE — The Metropolitan Downtown's event room was packed Wednesday evening with members of the public, local and state government officials, industrial developers and more who came wanting to hear about Project Tembo, Google's proposed $17 billion data center campus in Laramie…...

Yahoo Finance
finance.yahoo.com > technology > articles > meta-1-2b-kuna-data-100000976.html

Meta’s $1.2B Kuna data center is up and running. Here’s what to know

2+ day, 5+ hour ago   (264+ words) Meta flipped the switch Sept. 3 on its first Idaho data center, a 750,000-square-foot Kuna complex built over four years for $1.2 billion. The company is touting a new cooling design that uses far less water than typical server farms during much…...

WBAL News Radio
wbal.com > remington-residents-push-back-on-bge-high-voltage-transmission-towers-for-amtrak-tunnel-project

Remington residents push back on BGE transmission towers for tunnel project

3+ day, 3+ hour ago   (355+ words) Residents in North Baltimore’s Remington neighborhood are pushing back against BGE’s plan to construct high-voltage transmission towers as part of Amtrak’s Frederick Douglass Tunnel project. New towers would start near a Remington substation, cross train tracks, and extend toward a…...

The Killeen Daily Herald
kdhnews.com > business > killeen-advances-eight-areas-for-opportunity-zone-designation > article_405ce54f-718f-4a01-825f-375047261c1d.html

Killeen advances eight areas for Opportunity Zone designation

3+ day, 9+ hour ago   (812+ words) Eight Killeen census tracts have advanced for potential federal Opportunity Zone designation, narrowed down from a much larger pool of areas the city put forward earlier this year in hopes of drawing new private investment to some of its lowest-income…...