Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

Wion
wionews.com > world > russia-wants-to-build-360-kmph-ivolga-fg-trains-in-india-what-we-know-1789359183937

Russia proposes to build 360 kmph Ivolga FG trains in India: What happened on sidelines of BRICS

26+ min ago   (161+ words) WION - /Russia proposes to build 360 kmph Ivolga FG trains in India: What happened on sidelines of BRICS Russia has offered India its Ivolga FG high-speed train, designed to reach 360 kmph, with manufacturer Transmashholding proposing joint development and local production. TMH…...

Google News
indiashippingnews.com > cargo > indian-railways-begins-ahmedabad-mumbai-trials-of-first-vande-bharat-freight-train-targets-faster-cargo-movement

Indian Railways begins Ahmedabad-Mumbai Trials of First Vande Bharat Freight Train, Targets Faster Cargo Movement

1+ hour, 44+ min ago   (273+ words) NEW DELHI: Indian Railways has commenced trial runs of the country’s first Vande Bharat freight train on the Ahmedabad-Mumbai route, marking a significant step towards modernising India’s cargo transportation network. The 16-coach Electric Multiple Unit rake is designed to carry…...

Mid-day
mid-day.com-day.com

Indian Railways’ Vande Bharat cargo express reaches Mumbai for high-speed trials

2+ hour, 55+ min ago   (140+ words) 14 September,2026 08:02 AM IST | Mumbai | Rajendra B. Aklekar The 16-car rake will carry around 264 tonnes of cargo. Pic/By Special Arrangement Indian Railways' high-speed Vande Bharat cargo express reached Mumbai during the weekend for its high-speed trials. The super freighter is being…...

The Press
thepress.co.nz > nz-news > 36/10/78898 > limits-new-infrastructure-show-money-wasted-new-ferry-plan-says-letter-writer

Limits on new infrastructure show money wasted on new ferry plan, says letter writer

13+ hour, 27+ min ago   (16+ words) The Press...

Bol News
bolnews.com > pakistan > pakistans-ml-1-railway-project-nears-key-design-phase-adb-says

Pakistan’s ML-1 railway project nears key design phase, ADB Says | BolNews

10+ hour, 25+ min ago   (335+ words) ADB to finalize ML-1 railway design by October, paving way for procurement and implementation in Pakistan ISLAMABAD: Pakistan’s long-delayed Main Line-1 railway project is moving into a critical phase, with the Asian Development Bank set to finalize its design by October,…...

Todayville Edmonton
todayville.com > edmonton > ottawas-high-speed-rail-dream-risks-becoming-a-fiscal-nightmare

Ottawa’s high-speed rail dream risks becoming a fiscal nightmare

1+ day, 8+ hour ago   (1655+ words) The federal government’s Alto high-speed rail line, proposed to connect Toronto and Quebec City through Peterborough, Ottawa, Montreal, Laval and Trois-Rivières, remains in the early stages of planning. But one issue should already concern taxpayers: the projected $60-billion-to-$90-billion cost…...

ThePrint
theprint.in > india > indent-placed-for-first-ever-cement-rail-traffic-in-jammu-division > 3041793

Indent placed for first-ever cement rail traffic in Jammu Division

15+ hour, 9+ min ago   (369+ words) Jammu, Sep 13 (PTI) In a first for Jammu Railway Division, an indent has been placed for the movement of cement by rail from Shaheed Captain Sunil Kumar Choudhary Kathua Railway Station to Anantnag Railway Station, marking the beginning of cement…...

The News Mill
thenewsmill.com > 2026 > 09 > bairabi-sairang-rail-line-transforms-mizoram-connectivity

Bairabi-Sairang rail line transforms Mizoram connectivity

18+ hour, 8+ min ago   (935+ words) Home » Northeast India » Bairabi-Sairang rail line transforms Mizoram connectivity The Bairabi-Sairang railway line, inaugurated on September 13, 2025, has completed its first year of operations, marking a significant change in Mizoram’s passenger mobility, freight movement, tourism and access to wider markets. The…...

Google News
heraldgoa.in > goa > vande-bharat-freight-train-hits-130-kmph-during-ahmedabad-mumbai-trial > 488674

Vande Bharat Freight Train Hits 130 Kmph During Ahmedabad-Mumbai Trial

18+ hour, 25+ min ago   (182+ words) India’s first Vande Bharat freight train has reached a speed of 130 kmph during a trial run on the Ahmedabad-Mumbai Central route, marking a significant step in the development of faster rail freight services. The trial is being conducted by the…...

@i3masterminds
indianmasterminds.com > news > rvnl-41st-tunnel-breakthrough-escape-tunnel-1-rishikesh-karnprayag-232615

RVNL Achieves 41st Tunnel Breakthrough With 10.847-km Escape Tunnel-1 on Rishikesh-Karnprayag Rail Project - https://indianmasterminds.com

19+ hour, 58+ min ago   (618+ words) Home » News » RVNL Achieves 41st Tunnel Breakthrough With 10.847-km Escape Tunnel-1 on Rishikesh-Karnprayag Rail Project Dehradun: Rail Vikas Nigam Limited (RVNL) has achieved a major engineering milestone on the Rishikesh–Karnprayag Rail Project with the final breakthrough of Escape Tunnel-1. Measuring…...